{"id":242,"date":"2026-04-22T09:44:11","date_gmt":"2026-04-22T09:44:11","guid":{"rendered":"https:\/\/www.energel.ee\/projektid\/viimsi-40-mva-110-kv-joutrafod-2-tk\/"},"modified":"2026-04-22T09:44:11","modified_gmt":"2026-04-22T09:44:11","slug":"viimsi-40-mva-110-kv-jaudas-transformatori-2-gab","status":"publish","type":"projekt","link":"https:\/\/www.energel.ee\/lv\/projektid\/viimsi-40-mva-110-kv-joutrafod-2-tk\/","title":{"rendered":"Viimsi 40 MVA 110 kV jaudas transformatori (2 gab.)"},"content":{"rendered":"<p>Viimsi pussala ir viens no Igaunijas visstrauj\u0101k augo\u0161ajiem dz\u012bvojamajiem rajoniem, kur arvien pieaugo\u0161ais pat\u0113r\u0113t\u0101ju skaits un elektroauto uzl\u0101des un siltums\u016bk\u0146u izplat\u012bba izvirza t\u012bklam aizvien liel\u0101kas pras\u012bbas. Divu 40 MVA transformatoru uzst\u0101d\u012b\u0161ana 110 kV apak\u0161stacij\u0101 nodro\u0161in\u0101ja nepiecie\u0161amo p\u0101rvades jaudas rezervi, lai apmierin\u0101tu gan \u012bstermi\u0146a maksim\u0101lo slodzi, gan ilgtermi\u0146a slodzes pieaugumu. Rezerv\u0113t\u0101 (redundant\u0101) konfigur\u0101cija aizsarg\u0101 re\u0123ionu no trauc\u0113jumiem, kuriem liel\u0101s iedz\u012bvot\u0101ju koncentr\u0101cijas d\u0113\u013c b\u016btu iev\u0113rojama ietekme.<\/p>\n<p>Projekt\u0101 tika veikta eso\u0161\u0101s sadales iek\u0101rtas papla\u0161in\u0101\u0161ana ar jauniem pane\u013ciem un prim\u0101raj\u0101m kopn\u0113m, kam sekoja abu transformatoru uzst\u0101d\u012b\u0161ana un aizsardz\u012bbas autom\u0101tikas integr\u0113\u0161ana. B\u016bvdarbu pl\u0101no\u0161an\u0101 tika \u0146emta v\u0113r\u0101 minim\u0101la eso\u0161\u0101s apak\u0161stacijas darb\u012bbas trauc\u0113\u0161ana. Nodo\u0161ana ekspluat\u0101cij\u0101 tika veikta pa posmiem, nodro\u0161inot nep\u0101rtrauktu elektroapg\u0101di vis\u0101 b\u016bvniec\u012bbas period\u0101.<\/p>","protected":false},"excerpt":{"rendered":"<p>Viimsi apak\u0161stacij\u0101 Harjum\u0101 tika uzst\u0101d\u012bti divi 40 MVA jaudas transformatori 110 kV sist\u0113m\u0101, nodro\u0161inot strauji augo\u0161\u0101 Viimsi re\u0123iona ener\u0123ijas piepras\u012bjumu. Projekts nodro\u0161in\u0101ja dz\u012bvojamajam rajonam dro\u0161u elektroener\u0123ijas pieg\u0101di ar dubultu redundantu konfigur\u0101ciju.<\/p>","protected":false},"featured_media":243,"template":"","meta":{"_acf_changed":false,"footnotes":""},"projekt_category":[5,6],"class_list":["post-242","projekt","type-projekt","status-publish","has-post-thumbnail","hentry","projekt_category-korgepinge","projekt_category-trafod"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt\/242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/types\/projekt"}],"version-history":[{"count":0,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt\/242\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/media\/243"}],"wp:attachment":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/media?parent=242"}],"wp:term":[{"taxonomy":"projekt_category","embeddable":true,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt_category?post=242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}