{"id":244,"date":"2026-04-22T09:52:07","date_gmt":"2026-04-22T09:52:07","guid":{"rendered":"https:\/\/www.energel.ee\/projektid\/viljandi-40-mva-110-kv-joutrafod-2-tk\/"},"modified":"2026-04-22T09:52:07","modified_gmt":"2026-04-22T09:52:07","slug":"viljandi-40-mva-110-kv-jaudas-transformatori-2-gab","status":"publish","type":"projekt","link":"https:\/\/www.energel.ee\/lv\/projektid\/viljandi-40-mva-110-kv-joutrafod-2-tk\/","title":{"rendered":"Viljandi 40 MVA 110 kV jaudas transformatori (2 gab.)"},"content":{"rendered":"<p>Viljandi apak\u0161stacija ir Viljandim\u0101 elektroapg\u0101des centr\u0101lais mezglu punkts, kas apkalpo gan Viljandi pils\u0113tu, gan apk\u0101rt\u0113jo novadu pat\u0113r\u0113t\u0101jus. Vec\u0101kas paaudzes transformatoru nomai\u0146a pret m\u016bsdien\u012bg\u0101m, augst\u0101kas efektivit\u0101tes iek\u0101rt\u0101m noz\u012bm\u0113 iev\u0113rojami maz\u0101kus ener\u0123ijas zudumus un maz\u0101ku apkopes apjomu. Divas 40 MVA iek\u0101rtas nodro\u0161ina re\u0123ionam rezerv\u0113tu (redundantu) apg\u0101di, ko ikdien\u0101 prasa pils\u0113tas un apri\u0146\u0137a slod\u017eu sadal\u012bjums.<\/p>\n<p>Projekta gait\u0101 tika demont\u0113tas vec\u0101s iek\u0101rtas, sagatavoti pamati, uzst\u0101d\u012bti jauni transformatori un integr\u0113tas digit\u0101las aizsardz\u012bbas un automatiz\u0101cijas sist\u0113mas. Darbs tika veikts pa posmiem, lai izvair\u012btos no ilgsto\u0161iem elektroapg\u0101des p\u0101rtraukumiem iedz\u012bvot\u0101jiem. P\u0113c pilna apjoma nodo\u0161anas ekspluat\u0101cij\u0101 abas iek\u0101rtas tika piesl\u0113gtas operat\u012bvajai lieto\u0161anai, un apak\u0161stacijai tika nodota aktualiz\u0113ta iek\u0101rtu dokument\u0101cija.<\/p>","protected":false},"excerpt":{"rendered":"<p>Viljandi apak\u0161stacij\u0101 Viljandim\u0101 tika nomain\u012bti divi 40 MVA jaudas transformatori 110 kV sadales sist\u0113m\u0101, atjauninot pils\u0113tas un apri\u0146\u0137a elektroener\u0123ijas pieg\u0101des tehnisko b\u0101zi. Moderniz\u0113t\u0101 apak\u0161stacija nodro\u0161ina uzlabotu energoefektivit\u0101ti un modernu att\u0101lin\u0101to monitoringu.<\/p>","protected":false},"featured_media":245,"template":"","meta":{"_acf_changed":false,"footnotes":""},"projekt_category":[5,6],"class_list":["post-244","projekt","type-projekt","status-publish","has-post-thumbnail","hentry","projekt_category-korgepinge","projekt_category-trafod"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt\/244","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/types\/projekt"}],"version-history":[{"count":0,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt\/244\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/media\/245"}],"wp:attachment":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/media?parent=244"}],"wp:term":[{"taxonomy":"projekt_category","embeddable":true,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt_category?post=244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}