{"id":89,"date":"2026-02-26T15:49:40","date_gmt":"2026-02-26T15:49:40","guid":{"rendered":"https:\/\/www.energel.ee\/projektid\/lasnamae-linnajaotla-joutransformaatori-uuendus\/"},"modified":"2026-02-27T15:47:15","modified_gmt":"2026-02-27T15:47:15","slug":"lasname-pilsetas-apaksstacijas-jaudas-transformatora-atjauninasana","status":"publish","type":"projekt","link":"https:\/\/www.energel.ee\/lv\/projektid\/lasnamae-linnajaotla-joutransformaatori-uuendus\/","title":{"rendered":"Lasnam\u00e4e pils\u0113tas sadales jaudas transformatora atjaunin\u0101\u0161ana"},"content":{"rendered":"<p>Lasnam\u0113 ir Tallinas iedz\u012bvot\u0101ju zi\u0146\u0101 liel\u0101kais pils\u0113tas rajons ar gandr\u012bz 100 000 iedz\u012bvot\u0101jiem, kam pieskait\u0101s lieli tirdzniec\u012bbas centri, r\u016bpniec\u012bbas uz\u0146\u0113mumi un \u00dclemiste City biznesa centrs. Eso\u0161ais 63 MVA transformators bija ekspluat\u0101cij\u0101 vair\u0101k nek\u0101 25 gadus un pras\u012bja nomai\u0146u \u2014 izol\u0101cijas degrad\u0101cija bija sasniegusi kritisko f\u0101zi.<\/p>\n<p>T\u0101 k\u0101 Lasnam\u0113 elektroener\u0123ijas apg\u0101des p\u0101rtrauk\u0161ana ir pils\u0113tas p\u0101rvald\u012bbas zi\u0146\u0101 izsl\u0113gta, visu nomai\u0146as projektu pl\u0101noj\u0101m p\u0113c dubultsh\u0113mas principa: jauno CG Power 63 MVA tr\u012bstinumu transformatoru (115\/10,5\/6,3 kV) uzst\u0101d\u012bj\u0101m paral\u0113l\u0113\u0161anai pirms vec\u0101 demont\u0101\u017eas. P\u0113c slodzes p\u0101rsl\u0113g\u0161anas test\u0113\u0161anas veic\u0101m divdesmit min\u016b\u0161u sinhrono p\u0101rsl\u0113g\u0161anu.<\/p>\n<p>Papildus tika atjaunin\u0101ti visi aizsardz\u012bbas releju iestat\u012bjumi un AT baro\u0161anas \u0137\u0113des. Projekts tika pabeigts prec\u012bzi p\u0113c grafika.<\/p>","protected":false},"excerpt":{"rendered":"<p>Tallinas liel\u0101k\u0101 pils\u0113tas rajona ener\u0123ijas apg\u0101des st\u016brakmens \u2014 Lasnam\u0113 apak\u0161stacijas 63 MVA tr\u012bstinumu jaudas transformatora nomai\u0146a. Projekta kritisk\u0101k\u0101 pras\u012bba bija nulles d\u012bkst\u0101ve: nomai\u0146ai bija j\u0101notiek bez p\u0101rtraukuma gandr\u012bz 100 000 iedz\u012bvot\u0101ju elektroener\u0123ijas apg\u0101d\u0113.<\/p>","protected":false},"featured_media":103,"template":"","meta":{"_acf_changed":false,"footnotes":""},"projekt_category":[5,6],"class_list":["post-89","projekt","type-projekt","status-publish","has-post-thumbnail","hentry","projekt_category-korgepinge","projekt_category-trafod"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt\/89","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/types\/projekt"}],"version-history":[{"count":1,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt\/89\/revisions"}],"predecessor-version":[{"id":104,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt\/89\/revisions\/104"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/media\/103"}],"wp:attachment":[{"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/media?parent=89"}],"wp:term":[{"taxonomy":"projekt_category","embeddable":true,"href":"https:\/\/www.energel.ee\/lv\/wp-json\/wp\/v2\/projekt_category?post=89"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}